Parallel Operation Of Generators

The generating station either of d.c. type or of a.c. type, normally consists of number of smaller generators operating in parallel instead of large single unit capable of supplying the maximum load demand. These smaller units can run in single or in various parallel combinations to supply actual load for following different reasons.

1. Continuity and Reliability of Service

The most important requirement for any generator is its continuity. This can not be achieved if there is a single unit as in case of breakdown of prime mover or generator. there will be total unavailiability of the supply. This also affects the reliability of the supply. The requirement of uninterrupted supply is important in case of industrial loads as otherwise the economy may get affected. Thus instead of having a single large unit, Number of small generators are operated in parallel.

2. Maintenance and Repair

It is required to have a periodic checking and inspection of prime mover and generator to avoid the possibility of total breakdown or shunt down in future. If any of generators in under maintenance or repair then the load on that generator can be shared by other generators as all of them are working in parallel. Thus in case of failure or breakdown in any of the generators, the generator can be repaired with more care as other generators are available to maintain the service.

3. Efficiency

The load on the generating station is never constant. It varies from time to time with maximum demand occurring during morning and evening while minimum demand during late night hours. Most of the generators operate efficiently when delivering the full load. Thus when there is light load condition, it is economical to use a small, single unit. With increase in load demand, a large generator may be put in service instead of a smaller one or another smaller unit may be connected in parallel with the earlier unit which is already in service.

4. Increase in paint capacity

Additional generators are always installed in existing paint to supply increasing load demands. Provision for the future expansion is made from the begining itself. If number of generators are operating in parallel then it is easier to add other generators for parallel operation with increase in load demend.

admin

Share
Published by
admin

Recent Posts

Standby Generators and Custom Commercial Generators for Sale

Humankind has become extremely dependent on electricity, without it we can’t run the household, keep…

4 years ago

Electrical Machine Interview Question And Answer

[1] Define the term synchronous speed [Dec-2003] For synchronous machines there exists a fixed relationship…

7 years ago

Transformer Interview Questions With Answer

We shared a lot of interview questions on electrical machines, power system and power electronics. Today we…

7 years ago

What Is Diesel Power Station

DIESEL POWER STATION A generating station in which diesel engine is used as the prime…

7 years ago

Synchronous Generator Interview Questions

Q:Why syn. generators are used for the production of electricity? A:synchronous machines have capability to…

7 years ago

Hydro Power Station

Hydro-electric Power Station A generating station which utilises the potential energy of water at a…

7 years ago